Altajir Glass Factory

Altajir Glass Factory

Location:

Altajir Glass Factory
Dubai, United Arab Emirates

Business:

Manufacture of glass bottles with daily output of one million units.

Task:

To overcome the failure of the main ridge ventilator located above the melt furnace which is not allowing ample heat to escape. Prevailing winds are causing the ridge vent to backdraft.

Solution:

Edmonds supplied 16 x Hurricane™ H900 Ventilators that were installed, 8 down either side of the large ridge vent. Temperature of exhausted gases exceeds 80°C.

Result:

Customer is sufficiently pleased with the result, requested a full hurricane scheme for the entire plant.

Consultant:

Al Mutaiwie – Barrie Harmsworth

05 Jun 2004